This page shows all the projects undertaken by Rachel Papworth and Papworth Research & Consultancy. Click on any project title to see further details. If you are interested in projects undertaken for particular client types or for a particular service or policy area, use the search function to filter the list.

Search for a particular type of project.

Funding Bid Development - Monitoring and Evaluation
Date: May 2012
Client: The Friends Centre
Papworth Research & Consultancy Ltd helped The Friends Centre in Brighton & Hove to develop the monitoring and evaluation section of its £1million bid to the Lottery's Communities Living Sustainably fund.

"We now have a good understandi
Education Activity Plan
Date: May 2012 - July 2012
Client: Hastings Pier & White Rock Trust
Papworth Research & Consultancy Ltd assisted Hastings Pier Trust to develop the Education Action Plan to support its phase 2 bid to the Heritage Lottery Fund for refurbishment of Hastings Pier and delivery of activities from it.

The Educati
Insight Women's Group Evaluation
Date: October 2011 - February 2012
Client: Hastings & St Leonard's Children's Centres Programme
The Insight Women’s Group programme uses psychotherapy and life coaching to raise women's self-awareness and understanding, empower them to take positive action, and support them to develop self-esteem, optimism, self-efficacy and resilience.
Business Planning
Date: March 2011 - May 2011
Client: Selsey Pre-Trust Group
Working with The Pool, Papworth Research & Consultancy Ltd supported Selsey Pre-Trust Group to develop a business plan for a community owned trust as a means of funding the maintenance of Selsey’s coastal defences and revitalising Selsey.

Evaluation of Partners' Council & Participation in Adult Services Directorate
Date: July 2010 - February 2011
Client: Social Care Institute for Excellence
Through gathering the views of staff and other stakeholders, Papworth Research & Consultancy Ltd and InHealth Associates evaluated the participation culture and systems within the Adults Services Directorate of the Social Care Institute for Excellence (SC
Evaluation of Childrens Centre Drop-in Provision
Date: July 2010 - January 2011
Client: East Sussex County Council
Papworth Research & Consultancy Ltd consulted Childrens Centre staff and service providers, and undertook a face-to-face quantitative survey of parents and carers, to establish the value of drop-in services. In particular, we investigated:

  • The
  • Evaluation of West Sussex Rural Social & Community Programme
    Date: July 2010 - October 2010
    Client: Action in Rural Sussex
    Papworth Research & Consultancy Ltd evaluated this programme of projects addressing issues as diverse as rural affordable housing, health, access to services in rural areas, community transport provision and support for community buildings and assets.
    The Barriers Faced by Employers in Developing Lesbian, Gay, Bisexual & Transgender Friendly Workplaces
    Date: April 2010 - May 2010
    Client: National Institute of Economic & Social Research, Government Equalities Offices
    For the Government Equalities Office, the National Institute of Economic & Social Research (NIESR) investigated the barriers experienced by employers in developing workplaces that are lesbian, gay, bisexual and transgender (LGB&T) friendly. Rachel underto
    Final evaluation of Better Neighbourhood and Streetscene Projects
    Date: February 2010 - July 2010
    Client: Thornhill Plus You New Deal for Communities Partnership
    Building on the interim evaluation we undertook a year previously, Papworth Research & Consultancy undertook a final evaluation of the Better Neighbourhood project, a £3.6m capital programme of improvements to the areas around 88 blocks of flats across T
    Works & Skills Plan
    Date: January 2010 - July 2010
    Client: Norfolk County Council
    Working with Oxford Consultants for Social Inclusion (OCSI) and Educe Ltd, Papworth Research & Consultancy was involved in the production of a Work & Skills Plan for Norfolk. Following a successful bid for Future Jobs Funding, Norfolk County Council was u
    Development of ESOL plan and Adult Learning & Skills Plan
    Date: December 2009 - January 2010
    Client: West Sussex County Council
    Papworth Research & Consultancy developed a plan for how ESOL (English for Speakers of Other Languages) provision could be directed to contribute to the achievement of West Sussex County Council's priorities.

    This involved the following activities
    Evaluation of NCSI Service User Involvement Model
    Date: December 2009 - January 2011
    Client: Macmillan Cancer Support
    Papworth Research & Consultancy evaluated service user involvement within the NCSI (The National Cancer Survivorship Initiative), which aimed to improve services and support for people affected by cancer.

    We trained people affected by cancer to wor
    Evaluation of Climate Connections Project
    Date: August 2009 - March 2012
    Client: Brighton Peace & Environment Centre
    Papworth Research & Consultancy is the independent external evaluator for the Climate Connections Project.Climate Connections is funded by the Department for International Development and managed by a partnership of Brighton Peace & Environment Cen
    Park Management Business Planning
    Date: June 2009 - July 2009
    Client: Ashford's Future
    As one of four places in the South East identified by the Government as key growth areas, Ashford is set to double in size over the next 20 years. Green infrastructure is at the heart of the growth plans with high quality, multifunctional green space link
    Tree Strategy
    Date: April 2009
    Client: Southwark Council
    Papworth Research & Consultancy helped Southwark Council to produce a strategy for the management of the Borough's trees, both a major asset and a significant liability for the Council.
    Mid-term Evaluation of Better Neighbourhood Project
    Date: March 2009 - May 2009
    Client: Thornhill Plus You New Deal for Communities Partnership
    Though consultations with Thornhill Plus You, Southampton City Council, contractors and residents, Papworth Research & Consultancy evaluated this £3.6m capital programme of improvements to the areas around 88 blocks of flats across Thornhill, in Southamp
    Evaluation of the Employer Recognition Programme
    Date: February 2009 - March 2009
    Client: Qualifications and Curriculum Authority
    Working with The Mackinnon Partnership, we contributed to an evaluation of the Employer Recognition Programme, which accredited employers' in-house training programmes within the natio
    Asset Transfer and Capacity Building
    Date: December 2008 - April 2009
    Client: The Bridge New Deal for Communities Partnership
    Papworth Research & Consultancy worked with people aged under 25 and over 50 from five community organisations, building their capacity to manage a community centre as a sustainable resource. Through a series of engaging yet challenging activities and wor
    Children's Centres Phase 3 Consultation
    Date: December 2008 - March 2009
    Client: East Sussex County Council
    Papworth Research & Consultancy assisted East Sussex County Council to fulfill the Department for Children, Schools & Families' requirement that the views of parents/carers were taken into account in planning service provision associated with Phase 3 Chil
    Evaluation of the Education Improvement Project
    Date: March 2008 - September 2008
    Client: Ocean New Deal for Communities
    Papworth Research & Consultancy evaluated Ocean New Deal for Communities' Education Improvement Project. This six and a half year project aimed to raise pupils' educational attainment, increase learning participation and achievement, and increase parental
    South East England Development Agency's Coastal Framework: Select Committee Context & Issues Paper
    Date: October 2007 - February 2008
    Client: South East England Regional Assembly
    Working with The Mackinnon Partnership, we contributed to the production of a Context & Issues
    AIF Final Evaluation
    Date: January 2008 - March 2008
    Client: Brighton & Hove City Council
    Papworth Research & Consultancy undertook the final evaluation of the Brighton & Hove AIF Programme (which initially included the Adur District in West Sussex). We evaluated this £1.5m, three-year programme of investment in physical regeneration, busines
    Neighbourhood Involvement Facilitation Strategy
    Date: June 2007 - November 2007
    Client: Ealing Council
    Papworth Research & Consultancy's evaluation of the Community Capacity Building sub-programme of Ealing's Neighbourhood Renewal Programme found a requirement for community capacity building that would continue beyond the availability of Neighbourhood Rene
    Sustainability: Vocational Learning Infrastructure
    Date: June 2007 - February 2008
    Client: The Sussex Learning Network
    As part of its planning for sustainability, the Sussex Learning Network commissioned Papworth Research & Consultancy to explore the role which the Sussex Learning Network could play as a service, targeted at employers and employees and those preparing to
    Foundation Degree Marketing & Development
    Date: April 2007 - February 2008
    Client: The Sussex Learning Network
    Papworth Research & Consultancy undertook research for the Sussex Learning Network to inform the development and promotion of Foundation degrees in Sussex. The research investigated the following:
  • Successful methods of marketing Foundation degrees
  • Evaluation of Equal Project Prime Advantage
    Date: March 2007 - August 2007
    Client: Medway Council
    Prime Advantage was an Equal funded project which aimed to address labour market disadvantage faced by older p
    Evaluation of Infant Community Nursery Nurse Service
    Date: December 2006 - March 2007
    Client: Rural Sussex Children's Centre Programme, Greater Hollington Children's Centre Programme, Bexhill Children's Centre Programme
    We evaluated the impact of Infant Community Nursery Nurse posts to inform decisions as to whether the posts would be mainstreamed by the Primary Care Trust. Through a series of consultations, we explored the following questions:
  • Did the posts effec
  • Outreach Service Evaluation
    Date: December 2006 - February 2007
    Client: Rural Sussex Children's Centre Programme
    Through consultations with multi-agency partners, managers of settings and parents/carers, Papworth Research and Consultancy evaluated the impact of this outreach service. The aims of the evaluation were to assess the following:
  • The value placed on
  • Area Investment Fund Creative Industries Programme Evaluation
    Date: December 2006 - March 2007
    Client: Brighton & Hove City Council
    Through consultations with programme and project managers, a quantitative survey of beneficiaries, and visits to schools, Papworth Research & Consultancy evaluated this Area Investment Fund, South East England Development Agency and Council funded program
    Evaluation of Neighbourhood Renewal Community Capacity Building Projects
    Date: October 2006 - March 2007
    Client: Ealing Council
    Papworth Research & Consultancy evaluated a programme of community capacity building projects within Ealing's wider Neighbourhood Renewal Programme. Through consultation at programme, project and beneficiary level, we assisted the Local Strategic Partners
    Income generation
    Date: August 2006 - November 2006
    Client: East Hastings Children's Centres
    Papworth Research & Consultancy produced a report for East Hastings Children's Centres to use in negotiations with funders. The report compared the premises costs involved in delivering the core offer to the potential to generate income from Children's Ce
    Developing an Approach to Supporting Victims and Survivors of Domestic Abuse
    Date: July 2006 - October 2006
    Client: East Sussex Children's Centres
    Papworth Research & Consultancy supported the East Sussex Children's Centres to develop a consistent approach to supporting victims and survivors of domestic abuse through the following:
  • Identifying the activities and training delivered by each Chi
  • Secondary School Admissions Consultation
    Date: July 2006 - August 2006
    Client: Brighton & Hove City Council
    Papworth Research & Consultancy held focus groups with young people and adults to investigate views on improving the secondary schools admissions process and test reactions to a variety of models.
    Business Planning: Intermediate Labour Market Project
    Date: June 2006 - October 2006
    Client: Groundwork Southwark
    Papworth Research & Consultancy mentored a member of staff at Groundwork Southwark to assist them to produce a business plan for a horticulture programme aiming to improve employability among disadvantaged groups, and raise the quality of open spaces. The
    Business Plan: Burgess Park
    Date: April 2006 - May 2006
    Client: Groundwork Southwark
    Papworth Research & Consultancy worked with Groundwork Southwark to develop a business plan covering the potential transfer of the ownership and management of Burgess Park from the London Borough of Southwark to Groundwork Southwark. Burgess Park is a 54
    Young Victims of Crime
    Date: March 2006
    Client: Portsmouth City Council
    To assist Portsmouth City Council to meet its commitments within its Community Safety Strategy, Papworth Research & Consultancy audited and critiqued national, regional and local data sources with regard to young victims of crime, reporting to Portsmouth
    Project Appraisals
    Date: February 2006, December 2008 - January 2009
    Client: South East England Development Agency
    Papworth Research & Consultancy appraised a series of bids seeking South East England Development Agency funding for regeneration projects.
    Business Plans for Children's Centres
    Date: November 2005 - March 2006
    Client: Ealing Council
    Papworth Research & Consultancy supported voluntary providers and primary schools in the production of five year business plans for Children's Centres.
    Community Strategy Consultation
    Date: November 2005 - December 2005
    Client: Brighton & Hove City Council
    Papworth Research & Consultancy facilitated and analysed a series of focus groups to validate the contents of Brighton & Hove's updated Community Strategy.
    Project Appraisal - Interreg IIIC GROW Programme
    Date: October 2005
    Client: South East England Development Agency
    Rachel Papworth acted as the external appraiser for the first round of bids to the Business Growth theme of the GROW Interreg IIIC Programme. She appraised nine bids and made recommendations to the GROW Secretariat within the South East England Developmen
    Local Enterprise Growth Initiative (LEGI) bid
    Date: October 2005 - December 2005
    Client: Brighton & Hove City Council
    Papworth Research & Consultancy worked with Brighton & Hove City Council and its partners to produce the first draft of a £7.5million bid for LEGI funding.
    Evaluation Strategy
    Date: October 2005 - January 2006
    Client: Hollingdean Programme (Brighton & Hove)
    The Hollingdean Programme was an integrated Neighbourhood Renewal and Sure Start programme. Papworth Research & Consultancy worked with the Programme to assist it to develop a strategic approach to evaluation.

    This involved collating and assessing
    Neighbourhood Renewal: Evaluation & Forward Strategy
    Date: July 2005 - September 2005
    Client: Brighton & Hove City Council
    Papworth Research & Consultancy assessed the impact of the Neighbourhood Renewal agenda on service provision in Brighton & Hove. The main focus of the assignment was the development of a forward strategy to maximise mainstreaming and sustainability.
    Entry to Employment Programme (E2E) Research
    Date: April 2005 - June 2005
    Client: Learning & Skills Council Lincolnshire & Rutland
    Papworth Research & Consultancy investigated the drivers for demand for the Entry to Employment Programme (E2E) service in Lincolnshire & Rutland. The research involved focus group research with current E2E learners and potential E2E learners (ie the NEET
    Business Case for a Health Promotion Co-ordinator
    Date: May 2005
    Client: Ore Valley (Hastings) Sure Start
    Papworth Research & Consultancy assisted Ore Valley Sure Start to produce a Business Plan for the creation of the role of Health Promotion Co-ordinator. The new role involved working across areas covered by three Children's Centres and a Primary Care Trus
    Evaluation of Community Support Worker Role
    Date: February 2005 - May 2005
    Client: Ore Valley (Hastings) Sure Start
    Papworth Research & Consultancy evaluated the impact of the Community Support Worker at Ore Valley Sure Start on the effectiveness of the Sure Start partnership. The evaluation was undertaken through the following:

  • Consultations with service prov
  • Evaluation of Management Training for the Voluntary & Community Sector
    Date: September 2004 - December 2004
    Client: Bexley College
    Papworth Research & Consultancy evaluated this Learning & Skills Council (European Social Fund) funded project which aimed to build the capacity of voluntary and community sector organisations by providing training needs analyses, developing learning plan
    Awayday Facilitation
    Date: August 2004
    Client: Sussex Community Internet Project (SCIP)
    SCIP was holding an awayday to consider its future direction in the light of changes including the approaching conclusion of Single Regeneration Budget funding. Rachel Papworth facilitated this awayday and chaired the meeting.
    Evaluation of OASES Engineering Project
    Date: July 2004 - September 2004
    Client: Medway Council
    The OASES project, which attracted £175,000 from the European EQUAL programme, provided tailored short training solutions to SMEs in the engineering & manufacturing sector. It involved working through the supply chain to recruit employers to the project.
    Evaluation of Transforming Practice in Care
    Date: June 2004 - December 2004
    Client: Bexley College
    Papworth Research & Consultancy evaluated this project, which was funded by the Learning & Skills Council through the European Social Fund, and which aimed to contribute to meeting the Government directive that, by 2005, 90 per cent of existing care worke
    Evaluation of Towards an E-Confident College
    Date: June 2004 - March 2005
    Client: Bexley College
    Papworth Research & Consultancy evaluated this Learning & Skills Development Agency funded project which aimed to change the College culture from traditional learning to blended, flexible, e-learning. The evaluation was undertaken through a series of c
    Evaluation of Raising the Stakes
    Date: June 2004 - December 2004
    Client: Bexley College
    Papworth Research & Consultancy evaluated this project, funded by the Learning & Skills Council through the European Social Fund, which established a Borough-wide Employment Network. The network provided an integrated support service to beneficiaries, in
    Evaluation of Bus Lane
    Date: June 2004 - December 2004
    Client: Bexley College
    Papworth Research & Consultancy evaluated this project, funded by the Learning & Skills Council through the European Social Fund, which aimed to train unemployed people who wanted to become bus drivers but were facing barriers due to need for training in
    The Views & Needs of 14-19 Year Olds on Qualifications, Skills, Training & Work Issues
    Date: February 2004 - February 2005
    Client: Learning & Skills Council Hampshire & Isle of Wight; Connexions South Central
    In partnership with Hampshire & Portsmouth Learning Partnership and South Central Connexions, Learning & Skills Council Hampshire & Isle of Wight commissioned Papworth Research & Consultancy to investigate the views and needs of 14-19 year olds with regar
    Focus Group Research with Modern Apprentices
    Date: September 2003 - October 2003
    Client: South West Regional Development Agency; KPMG
    Papworth Research & Consultancy facilitated a series of focus groups with young people on Modern Apprenticeships to investigate their perceptions of the programme.
    Strategic Area Review: Consultation with Young People
    Date: August 2003 - March 2004
    Client: Learning & Skills Council Berkshire
    Papworth Research & Consultancy assisted Learning & Skills Council Berkshire to consult young people, to inform its Strategic Area Review. Our research involved a self-completion survey and focus groups, each with a range of specific groups of young peopl
    Adult Learner Forums
    Date: July 2003 - October 2003
    Client: Surrey Lifelong Learning Partnership
    Surrey Lifelong Learning Partnership commissioned research involving focus groups with seven or eight specific groups of people within each of its ten Community Learning Partnership areas. Papworth Research & Consultancy undertook the work in three areas
    Strategic Area Review: Land Based Training
    Date: June 2003 - October 2003
    Client: Learning & Skills Council Kent & Medway; KPMG
    For Learning & Skills Council Kent & Medway, KPMG undertook the Strategic Area Review of the provision of training to land based industries across Kent & Medway.

    Papworth Research & Consultancy was responsible for examining demand for skills and tr
    Evaluation of IT2You
    Date: June 2003 - October 2003
    Client: Learning & Skills Council Berkshire
    IT2You aimed to raise awareness, understanding and take-up of Information & Communications Technology (ICT) user training. It set out to market, in a coherent and rationalised fashion, the plethora of ICT-related training opportunities available to busine
    Evaluation of the National Academy for Gifted & Talented Youth
    Date: April 2003 - February 2005
    Client: Department for Education & Skills; KPMG
    Rachel Papworth worked with the KPMG team evaluating the National Academy for Gifted & Talented Youth (NAGTY).

    Focusing on the assessment of impact and customer satisfaction, she contributed to the development of the methodology for assessing the o
    Evaluation of Business Competitiveness Through Information & Communications Technology
    Date: April 2003 - June 2004
    Client: Bexley College
    Papworth Research & Consultancy evaluated this Learning & Skills Council funded project which aimed to promote the use of Information & Communications Technology by individuals (to improve employability) and businesses (to enhance productivity and competi
    Evaluation of Back to Basics
    Date: April 2003 - June 2004
    Client: Bexley College
    Papworth Research & Consultancy evaluated this Learning & Skills Council funded project, which aimed to develop the capacity of the College to deliver training in Basic Skills and English for Speakers of Other Languages. The project aimed to increase the
    Evaluation of Discretionary Fund
    Date: March 2003 - March 2004
    Client: Learning & Skills Council Kent & Medway
    Papworth Research & Consultancy evaluated 54 Local Initiatives Fund (LIF) and co-financed European Social Fund (ESF) projects managed by Learning & Skills Council Kent & Medway (LSCKM). An interim and final evaluation was undertaken of each project to con
    Learner's Voice Research: Residents of Areas of Deprivation
    Date: February 2003 - March 2003
    Client: Surrey Lifelong Learning Partnership
    Though Surrey is an economically prosperous County, the headline figures hide pockets of deprivation which are too localised to register on official statistics.

    This project contributed to the development of an approach to accessing the perceptions
    Learner's Voice Research: Young People Employed in the Retail Sector
    Date: February 2003 - July 2003
    Client: Surrey Lifelong Learning Partnership
    Papworth Research & Consultancy worked with Surrey Lifelong Learning Partnership to develop an approach to researching the perceptions of learning & training held by young people employed in both independent retail SMEs and in larger multi-outlet retail b
    Strategic Area Review: Local Area Reviews
    Date: January 2003 - October 2003
    Client: Learning & Skills Council Essex; KPMG
    Papworth Research & Consultancy worked with KPMG to deliver reviews of 14+ education & training provision (in Basildon & Thurrock and in Castlepoint, Rochford & Southend) designed to help Learning & Skills Council Essex meet the requirements for its Strat
    New Opportunities Fund Bids
    Date: January 2003 - March 2003
    Client: Ealing Council Playservice
    Papworth Research & Consultancy assisted Ealing Council Playservice to work with a variety of local groups developing bids for New Opportunities Funding to support out of school childcare projects. All submitted bids were successful.
    South Acton Children's Centre Proposal
    Date: January 2003 - March 2003
    Client: Ealing Council Playservice
    Papworth Research & Consultancy assisted Ealing Council to produce the business case for the development of a Play Centre on the South Acton Estate. The purpose of the Play Centre was to provide childcare and other services to children in the four to four
    Neighbourhood Nurseries Initiative Bids
    Date: October 2002 - December 2002
    Client: Ealing Early Years Childcare Development Partnership
    Papworth Research & Consultancy assisted Ealing Early Years Childcare Development Partnership to produce five-year business plans for five neighbourhood nurseries. All the nurseries subsequently operated successfully and met their targets.
    Learner Research
    Date: June 2002 - August 2002
    Client: Kent & Medway Learning & Skills Council; KPMG
    Working with KPMG, Papworth Research & Consultancy undertook a series of focus groups with residents of Kent & Medway (including vulnerable groups, such as young refugees and asylum seekers) to investigate attitudes to training and learning. The research
    Evaluation of European Social Fund Funded Small & Medium Sized Enterprise Workforce Planning Project
    Date: July 2002
    Client: Learning & Skills Council Kent & Medway
    The Small & Medium Sized Enterprise (SME) Workforce Planning Project was designed to pilot workforce development planning for manufacturing & engineering and 'other services' businesses. Owner/managers were provided with free access to an online business
    A Healthy Labour Market for the South East
    Date: May 2002
    Client: South East England Development Agency
    Papworth Research & Consultancy contributed to the production of a paper by the Institute for Employment Studies which described what a healthy South East labour market might look like and identified performance indicators against which the South East Eng
    Evaluation of Changing Lives
    Date: March 2002
    Client: Bexley College
    Changing Lives was a Local Initiatives Fund (LIF) project with the aim of exploring and piloting ways to co-ordinate targeted training & learning provision for those with the greatest disadvantage. Beneficiaries were offered tasters and short courses in a
    Evaluation of Gateway to Learning
    Date: January 2002 - March 2002
    Client: Lewisham Adult College
    Gateway to Learning was a Local Initiatives Fund (LIF) funded project which aimed to target 'non learners' in areas of low participation (especially those in need of basic skills upskilling) and develop processes and systems for the 'capture' of these lea
    Best Practice in the Employment of Young People
    Date: December 2001 - April 2002
    Client: Learning & Skills Council Central London
    Working with the Institute for Employment Studies, Papworth Research & Consultancy undertook semi-structured face-to-face consultations with a range of Central London employers to investigate their approach to recruiting, inducting and managing young peop
    Workforce Development Research
    Date: December 2001 - March 2002
    Client: Learning & Skills Council Sussex
    To inform its Workforce Development Strategy, Learning & Skills Council Sussex asked consultants to conduct reviews of 12 key sectors within the local economy, examining the supply of and demand for training/learning and key skills issues. Papworth Resear
    Mapping Qualifications Among Staff of Further Education & Training Providers
    Date: November 2001 - July 2002
    Client: South London Learning Partnership
    In the light of changing legislation regarding qualifications which training providers should hold, the South London Learning Partnership wished to gather reliable information on the qualifications held by training providers working with members of the Pa
    Evaluation of Sustainable Tourism Transport for Wales
    Date: September 2001 - February 2002
    Client: North Wales Tourism; MarketFlair
    Papworth Research & Consultancy evaluated this European Regional Development Fund (ERDF) supported programme, which aimed to develop and promote public transport provision for tourist visitors to Wales. The programme was in receipt of ERDF under the Rural
    Single Regeneration Budget Programme Evaluations
    Date: September 2001 - November 2001
    Client: Stratford Development Partnership
    Papworth Research & Consultancy, working with The Mackinnon Partnership, was involved in evaluations of two Single Regeneration Budget programmes managed by Stratford Developm
    Single Regeneration Budget Funding Bid
    Date: September 2001
    Client: Brighton & Hove City Council
    Papworth Research & Consultancy worked with Brighton & Hove Council to revise a bid for Single Regeneration Budget funding which had been rejected by the South East England Development Agency. The bid sought resources to support a full-time Grant Advisor
    Review of Arrangements for Delivery of Education Business Partnership Services
    Date: September 2001
    Client: Islington Education Department
    Based on consultations with 18 individuals involved with Education Business Partnership activities in Islington and neighbouring boroughs, Papworth Research & Consultancy produced a report considering the options for the ongoing delivery of such activitie
    Identification of Key Issues
    Date: September 2001
    Client: Windsor & Maidenhead Learning Partnership
    Windsor & Maidenhead Lifelong Learning Partnership commissioned a review of information concerning training and learning issues among Windsor & Maidenhead residents. The resulting report identified information gaps and recommended ways in which these coul
    Attitudes to Training & Learning
    Date: September 2001 - January 2002
    Client: Brighton & Hove Learning Partnership
    Papworth Research & Consultancy developed and piloted a method for gaining in-depth qualitative information on training & learning needs and barriers to participation in education and training, among specific groups of Brighton & Hove residents. The overa
    Common Framework for Labour Market Information & Skills Forecasting
    Date: June 2001 - July 2001
    Client: National Training Organisations National Council
    Papworth Research & Consultancy, working with the Institute for Employment Studies, contributed to the development of a UK-wide framework for the collection, analysis & dissemination of sector based labour market information and skills foresight.
    Market Research: Reception Facility for Community & Voluntary Organisations
    Date: March 2001 - July 2001
    Client: Hammersmith & Fulham Action for Disability
    HAFAD and the Urban Partnership Group were considering the creation of a service providing a telephone reception facility for community and voluntary organisations. Papworth Research & Consultancy investigated the market for this service and the potential
    Review of Economy of Charnwood Borough
    Date: March 2001 - July 2001
    Client: Leicestershire County Council
    Papworth Research & Consultancy produced an analysis of the economy of Charnwood Borough, within the context of the emerging Leicestershire Economic Strategy and East Midland Development Agency's Economic Strategy.
    Evaluation of Education Business Partnership
    Date: March 2001 - April 2001
    Client: Surrey Education Business Partnership
    Working with Tim Holmes & Associates, Papworth Research & Consultancy evaluated the effectiveness of Education Business Partnership activities in Surrey through interviews with teachers, business representatives and Education Business Partnership Managers
    Your Life, Your Learning
    Date: February 2001 - April 2001
    Client: Merton Learning Partnership
    Merton Learning Partnership wished to gather the views of a sample of the population of the ward of St Helier in relation to learning: their perceptions of learning opportunities; their attitudes to learning; barriers to learning etc. To investigate these
    Analysis of Employment & Qualifications Survey
    Date: February 2001 - March 2001
    Client: London East Training & Enterprise Council
    The Employment & Qualifications Audit (EQA) was conducted by LETEC in 1988 as a one-off survey of households in the LETEC and Lee Valley areas. Its aim was to produce a snapshot of the employment, training/learning and qualifications of employed and out-o
    Development of Partnership Agreements & Monitoring Arrangements
    Date: November 2000 - March 2001
    Client: London Education Business Link Organisation Consortia
    The Pan London Consortia Management Group commissioned a Guide to producing Partnership Agreements and Performance Indicators. The guide was used to assist the development of the new Education Business Link Organisation Consortia, and their constituent or
    Evaluation of South West London Learning Gateway
    Date: November 2000 - January 2001
    Client: AZTEC (Training & Enterprise Council for the London Boroughs of Kingston, Merton and Wandsworth)
    The Learning Gateway aimed to assist 16 and 17 year olds who were unable or unwilling to participate in education, training or employment, without additional support. The approach was to provide tailor-made support to help individuals overcome personal an
    Development of Local Consortium
    Date: October 2000
    Client: Leicestershire Education Business Partnership
    For Leicestershire Education Business Partnership, Papworth Research & Consultancy undertook an analysis of data the EBP had gathered on its partners' views concerning the form the local consortium of education business link organisations should take.
    Best Value Review of Employment Foundation Service
    Date: June 2000 - October 2000
    Client: Cambridge City Council
    The Employment Foundation Service (EFS) delivered training and employment services to disadvantaged members of the community who would otherwise be prevented from accessing training due to the high cost of providing training to them. The evaluation aimed
    West London Objective 2 Strategy & Action Plan
    Date: June 2000 - August 2000
    Client: London Boroughs of Brent, Ealing, Hammersmith & Fulham
    Acting as a facilitator, Rachel Papworth assisted the Core Working Group and Strategic Working Groups to develop their project ideas and contribute to the creation of the Delivery Plan.
    Evaluation of Intermedia
    Date: February 2000 - March 2000
    Client: London Borough of Hammersmith & Fulham
    The London Borough of Hammersmith & Fulham commissioned an independent evaluation of Intermedia, an organisation with the aim of increasing the diversity of the media workforce, both on and off screen. Intermedia had three funding streams, INTEGRA (Europe
    Encouraging Graduates from Higher Education Institutions to Live & Work in Hampshire
    Date: January 2000 - March 2000
    Client: Hampshire Training & Enterprise Council
    Hampshire Training & Enterprise Council commissioned this project to investigate the influences upon the decision making processes of graduates from the four Higher Education Institutions in Hampshire with regard to where they would live after they left t
    Development of Research Specification for Evaluation of Individual Learning Accounts
    Date: January 2000
    Client: Hampshire Training & Enterprise Council
    Papworth Research & Consultancy produced a specification to be used to commission an evaluation of the South East's pilot Individual Learning Account programme.
    Best Practice in Using Skills Forecasting to Develop FE & Training Products
    Date: December 1999 - February 2000
    Client: Further Education Development Agency; London East Training & Enterprise Council
    Papworth Research & Consultancy undertook in-depth consultations with nine private training providers and four further education providers to identify best practice in using labour market information and skills foresight within the process of planning and
    Audit of Business Support Providers
    Date: November 1999 - May 2000
    Client: Sussex Enterprise
    This project was undertaken to facilitate the development of the Small Business Service; providing necessary information to ensure that it plugged gaps in business support provision within Sussex and avoided duplicating existing provision. The aims of the
    Childcare Audit
    Date: November 1999 - January 2000
    Client: London Borough of Tower Hamlets; London East Training & Enterprise Council
    Papworth Research & Consultancy produced a comprehensive review of childcare demand and provision within the London Borough of Tower Hamlets.
    Evaluation of Marketing & Promotions
    Date: July 1999 - August 2000
    Client: Llandudno Hotels & Restaurants Association
    The Llandudno Hotels & Restaurants Association commissioned Papworth Research & Consultancy to evaluate the outcomes of a series of European Regional Development Fund (ERDF) supported tourism marketing initiatives.
    Evaluation of ONE Marketing
    Date: July 1999 - August 1999
    Client: Benefits Agency; Employment Service
    After the launch of ONE, at that time a new system for claiming benefit for people of working age, Papworth Research & Consultancy worked with Market Research Services to investigate early reactions to the advertising and perceptions of the ONE service. B
    Sussex Business Survey Report
    Date: July 1999 - August 1999
    Client: Sussex Enterprise
    Papworth Research & Consultancy analysed data arising from a telephone survey of 1,750 Sussex based businesses and produced reports designed to be accessible to an external audience.
    Recruitment Issues Among Engineering Undergraduates
    Date: June 1999 - September 1999
    Client: Royal Navy
    To assist the Royal Navy in addressing a shortfall in the recruitment of graduate engineers, Papworth Research & Consultancy worked with Market Research Services to establish how service as an Officer Engineer could be made more attractive to the targ
    Evaluation of First Step Job Search Guidance Programme
    Date: March 1999 - June 1999
    Client: Manchester Training & Enterprise Council
    First Step was funded through the Single Regeneration Budget, the European Social Fund, Manchester Training & Enterprise Council and (via Tameside College) the Further Education Funding Council. It aimed to enhance the employment prospects, education and
    Development of Project Access Stage 4 Leaflets
    Date: February 1999 - April 1999
    Client: Department of Social Security
    This research project, undertaken with Market Research Services, was the fourth stage of Project Access, a process aimed at reducing significantly the number of leaflets provided for the public concerning the twenty or so benefits which were at that time
    Finance & Call Centre Sector Study
    Date: December 1998 - March 1999
    Client: Bradford & District Training & Enterprise Council
    Bradford & District Training & Enterprise Council (TEC) commissioned a study of the finance & call centre sector in its area with the following aims:
  • To define the structure of the industry in Bradford & District.

  • To examine recent and a
  • Evaluation of Business in Prison
    Date: December 1998 - February 1999
    Client: North Nottinghamshire Training & Enterprise Council
    EMOEC (which was comprised of the seven Training & Enterprise Councils (TECs) of the East Midlands, Probation Services, HM Prison Service, Employment Service, Government Office for the East Midlands, Princes Youth Business Trust, Business in the Community
    Rural Development: Best Practice Regarding Information Communications Technology
    Date: November 1998 - June 1999
    Client: Leicestershire County Council
    Leicestershire County Council commissioned a study to identify and investigate best practice examples of Information Communications Technology related projects that had been introduced, by local authorities in other areas in Great Britain, to benefit rura
    Evaluation of Learning for Work Module
    Date: November 1998 - January 1999
    Client: University of Central Lancashire
    For the University of Central Lancashire, Papworth Research & Consultancy evaluated a pilot module which was designed to enable students to integrate employment outside the University into their learning. The evaluation involved the following activities:
    Market Research: Demand for a Recruitment Agency
    Date: October 1998 - March 1999
    Client: Lancashire Area West Training & Enterprise Council; CareerLink (Careers Service); University of Central Lancashire
    The three client organisations were considering the development of a joint venture recruitment agency and commissioned Papworth Research & Consultancy to do the following:
  • Develop a comprehensive database of companies in the North West operating in com
  • Economic Strategy & Action Plan
    Date: October 1998 - January 1999
    Client: Wythenshawe Single Regeneration Budget Partnership
    Working with GFA Consulting, Papworth Research & Consultancy provided Wythenshawe Partnership with research data, a strategy and action plans in relation to business development and training/employment access. Supporting data for the action plan was drawn
    Evaluation of Greater Manchester, Lancashire & Cheshire Objective 2 Programme
    Date: October 1998 - December 1998
    Client: Government Office North West
    Working with Pion Economics, Papworth Research & Consultancy undertook an evaluation of this Objective 2 Programme, based on case studies of projects funded through it.
    Rural Economic & Skills Analysis
    Date: September 1998 - March 1999
    Client: Wyre Borough Council; Lancashire Area West Training & Enterprise Council
    This study aimed to gather information which Wyre Borough Council and partners required to support programmes to create sustainable local employment and to address local peripherality and social issues. It involved the following activities:
  • A telephone
  • Economic Impact Study
    Date: August 1998 - March 1999
    Client: Blackpool Pleasure Beach
    Blackpool Pleasure Beach commissioned an assessment of the economic impact of the company on its local economies (i.e. Blackpool and the North West of England) and within the wider UK economy. The project involved the following activities:
  • A review
  • Evaluation of Business Information Matrix
    Date: August 1998 - February 1999
    Client: Business Link Dudley
    Business Link Dudley commissioned an evaluation of its Business Information Matrix Network (The Matrix), a unique electronic information service, which had been adopted by several Business Links in the West Midlands.

    The objective of the evaluation
    Evaluation of Career Management Module
    Date: March 1998 - April 1998
    Client: University of Central Lancashire
    The University of Central Lancashire received funding from the Department for Education & Employment to undertake a two year project which aimed to develop students' career management skills. The project involved four strands of activity:
  • The deve
  • The Market for Investors in People Among Enterprises with 10 to 49 Employees
    Date: February 1998
    Client: Merseyside Training & Enterprise Council
    Papworth Research & Consultancy, working with Meridien Pure, investigated the market for Investors in People (IiP) among enterprises employing 10 to 49 people through the following research activities:
  • A literature review.

  • A review of Me
  • Baseline Study
    Date: December 1997 - July 1998
    Client: Wigan Metropolitan Borough Council Single Regeneration Budget Partnership
    This project formed the baseline study for the Investing in Tomorrow's Citizens Single Regeneration Budget (SRB) Programme. The overall aim for the study was to gather baseline data in such a way as could be replicated in Years three and five of the SRB p
    Evaluation of European Regional Development Fund (ERDF) Supported Tourism Marketing Activities
    Date: October 1997 - January 2001
    Client: North Wales Tourism
    Papworth Research & Consultancy was retained for over three years by North Wales Tourism to undertake evaluations of a series of tourism marketing projects in receipt of European Regional Development Fund (ERDF) funding through the region's Objective 5b p
    Analysis of Further Education Competitiveness & Development Fund
    Date: October 1997 - February 1998
    Client: Department for Education & Employment
    Papworth Research & Consultancy undertook an Analysis of the Further Education Development Fund, producing dir
    Textiles & Clothing Sector Study & Strategic Plan
    Date: June 1997 - November 1997
    Client: Lancashire Area West Training & Enterprise Council; Business Link Central Lancashire; Preston, Chorley & South Ribble Borough Councils
    This study formed part of the textiles industry renaissance programme backed by the European Regional Development Fund (ERDF) Konver II programme for the North West. The sector study involved desk research, focus groups with employers and in-depth intervi
    Training Needs of Micro Businesses
    Date: June 1997
    Client: North Yorkshire Training & Enterprise Council
    Papworth Research & Consultancy undertook telephone consultations with micro businesses across North Yorkshire to assess their training & learning needs, and fed the findings into this study, commissioned from Pieda plc.
    Evaluation of Education Business Partnership
    Date: May 1997 - November 1997
    Client: Leicestershire Training & Enterprise Council
    This strategic review of the Education Business Partnership (EBP), undertaken while employed by Pieda plc, involved best practice research (drawing on a literature review and evaluations of other EBPs), consultations with 23 partners (including the EBP co
    Evaluation of Pre-Vocational Training Pilot
    Date: May 1997 - July 1997
    Client: Milton Keynes & North Bucks Chamber of Commerce, Training & Enterprise
    Headstart was one of a series of Pre-Vocational Pilots funded by the Department for Education & Employment. It ran from May 1996 to March 1997 and its aim was to enable unemployed people with a wide range of learning and/or behavioural problems to access
    Interim Evaluation of Objective 5b Programme for Rural Wales
    Date: February 1997 - March 1997
    Client: Welsh Office
    Rachel Papworth contributed to this evaluation while employed at Pieda plc, undertaking a series of in-depth case studies of projects in receipt of European Social Fund(ESF) and European Regional Development Fund (ERDF), and in-depth consultations with in
    Development of Project Funding Applications
    Date: 1996 - 1997
    Client: North Liverpool Single Regeneration Budget Partnership
    Rachel Papworth worked with community & voluntary groups in North Liverpool to assist them to develop project ideas and submit funding bids to the Single Regeneration Budget (SRB) Partnership.
    Economic Assessment
    Date: December 1996 - January 1997
    Client: Manchester Training & Enterprise Council
    While working at Pieda plc, Rachel Papworth produced an economic assessment for Manchester Training & Enterprise Council (TEC) in the form of snapshots of 14 sectors.
    Feasibility of a Major Heritage Attraction
    Date: November 1996
    Client: Wirral Metropolitan Borough Council
    Wirral Metropolitan Borough Council needed statistical information to back up a case for the citing of a national heritage attraction on the Wirral. Pieda plc were asked to respond quickly and Rachel Papworth produced a short paper making the case for the
    Impact of Economic Development Support Measures
    Date: October 1996
    Client: Furness Enterprise
    While working at Pieda plc, Rachel Papworth produced a short paper for Furness Enterprise assessing the impact the organisation had had on the local economy, to support its case for the formation of an Enterprise Zone.
    Evaluation of Management Development Activity
    Date: September 1996 - February 1997
    Client: Department for Education & Employment
    For the Department for Education & Employment, while employed by Pieda plc, Rachel Papworth assessed management development activities being undertaken by Training & Enterprise Councils (TECs) nationally.
    Development of Customer Satisfaction Framework
    Date: 1996
    Client: Milton Keynes & North Bucks Chamber of Commerce, Training & Enterprise
    Working with Abrams Research Consultants, Papworth Research & Consultancy contributed to the development of a framework for the ongoing monitoring of customer satisfaction by the Chamber of Commerce, Training & Enterprise.
    World Class Manufacturing
    Date: August 1996 - April 1997
    Client: Milton Keynes & North Bucks Chamber of Commerce, Training & Enterprise; Business Link Bedfordshire; Business Link Heart of England
    This project, undertaken with Abrams Research Consultants, involved the following:
  • Exploring the links (clusters, supply chain links etc) between local industry sectors throughout the region and considering how these should influence the developme
  • Customer Satisfaction
    Date: August 1996 - September 1996
    Client: Forte Hotels
    As part of a project being undertaken by P-E International considering the effective deployment of staff, Rachel Papworth undertook customer satisfaction research among guests at Forte Hotels.
    Benchmarking
    Date: 1996
    Client: HM Treasury; National Savings Stock Register; Bank of England
    This project involved benchmarking government debt registration services against the private sector.
    Market Testing
    Date: 1996
    Client: Ministry of Defence
    Rachel Papworth worked with the Ministry of Defence to produce internal costings for support services provided to the Army as part of a Market Testing exercise.
    Self-Assessment Helpline & Orderline
    Date: January 1996
    Client: Inland Revenue
    To support the introduction of Self-Assessment, the Inland Revenue needed assistance with the development of a business case for the creation of a self-assessment telephone helpline and documentation orderline.
    Benchmarking
    Date: October 1995
    Client: West Midlands Development Agency
    Companies supplying the West Midlands motor industry were benchmarked against performance indicators and the model developed was further refined into a tool that could be used by Training & Enterprise Councils to benchmark their employer base.
    Monitoring Nurses' Pay
    Date: August 1995 - October 1995
    Client: Office of Manpower Economics
    Based at the Office of Manpower Economics, Rachel Papworth trained and managed a team of researchers undertaking semi-structured consultations with NHS Hospital Trusts to gather information on pay awards to nurses and professions allied to medicine. The d
    Evaluation of Education Business Partnership Work Experience Programmes
    Date: 1995
    Client: Coventry & Warwickshire Training & Enterprise Council
    Rachel Papworth undertook evaluations of the work experience programmes delivered in Coventry & in Warwickshire based on in-depth consultations with partners, a structured telephone survey of employers, a semi-structured telephone survey of teachers and f
    Market Research into Demand for Courses
    Date: January 1995 - April 1995
    Client: Calderdale College
    Rachel Papworth investigated explicit and latent demand for courses provided by Calderdale College among residents and businesses in the Calderdale area, while employed by Lancashire Enterprises. The project involved self-completion surveys of all staff a
    Skills Audit
    Date: 1994
    Client: Batley Action
    Rachel Papworth managed the second year of a five year project which involved undertaking a skills audit on an annual basis to enable Batley Action, the City Challenge Partnership for Batley in West Yorkshire, to monitor its impact on the City Challenge
    Quality Assurance in Special Needs Training
    Date: 1994
    Client: South Thames TEC; Employment Department
    This project, undertaken at Lancashire Enterprises plc involved considering the existing quality assurance procedures for special needs training provision and assessing the case for the production of a charter for special needs trainees.
    Review of Borough Council Agenda 21 Activities
    Date: 1994
    Client: Lancashire County Council
    For this project, undertaken at Lancashire Enterprises plc, Rachel Papworth undertook consultations with all the Borough Councils within Lancashire. She produced a comprehensive review of their response to Agenda 21, the United Nations' sustainable develo
    Application for Licensed Status
    Date: 1994
    Client: Bolton Bury Training & Enterprise Council
    Rachel Papworth worked with Bolton Bury Training & Enterprise Council (TEC), while employed by Lancashire Enterprises plc, to assist the TEC to develop its application for licensed status.
    Evaluation of Training Credits Pilot
    Date: 1994
    Client: Merseyside Training & Enterprise Council
    While employed at Lancashire Enterprises plc, Rachel Papworth was undertook focus groups with trainees for an evaluation of this Training Credits pilot (at that time, a new way to deliver youth training).
    Evaluation of Training Credits Pilot
    Date: 1994
    Client: Mid Glamorgan Training & Enterprise Council
    While employed at Lancashire Enterprises plc, Rachel Papworth was involved in this evaluation of a Training Credits pilot (at that time, a new way to deliver youth training), which involved surveys and face-to-face interviews with young people, training p
    Evaluation of Training Credits Pilot
    Date: 1993
    Client: Stockport & High Peak Training & Enterprise Council
    While employed at Lancashire Enterprises plc, Rachel Papworth was involved in this evaluation of a Training Credits pilot (at that time, a new way to deliver youth training), which involved the development and implementation of performance indicators.
    The Development of Bulgarian Labour Offices
    Date: June 1993 - August 1993
    Client: European Commission Phare Programme
    Based in the Smolyan region of Bulgaria, Rachel Papworth worked with local labour offices to develop the services they offered to the unemployed, as part of a programme of work being undertaken by Lancashire Enterprises.
    European Strategy
    Date: April 1993 - October 1993
    Client: Leominster District Council; South Herefordshire District Council; Malvern Hills District Council; Hereford City Council; Rural Development Commission
    A process of open learning, workshops and strategy development was undertaken leading to the development of a report advising the four local authorities on how to integrate a European dimension into their strategic approach.
    Strategic Sites in the Preston Travel to Work Area
    Date: 1993
    Client: Commission for the New Towns
    This project, undertaken at Lancashire Enterprises plc, created a directory of strategic sites.
    Skills Audit
    Date: 1992 - 1993
    Client: Leicester City Challenge
    A large scale face-to-face survey of residents of the Leicester City Challenge area provided the City Challenge partnership with baseline data against which to measure its performance.
    Teleworking in Calderdale & Kirklees
    Date: 1992
    Client: Calderdale Metropolitan Borough Council; Kirkless Metropolitan Borough Council; Calderdale & Kirklees Training & Enterprise Council; Rural Development Commission
    While employed at Lancashire Enterprises, Rachel Papworth investigated the potential for the Calderdale & Kirklees area of West Yorkshire to develop as a centre for teleworking.
    Advice & Support for Small Firms
    Date: 1991
    Client: Department of Employment
    The Institute of Manpower Studies was commissioned to assess the sources of advice used by small firms and Rachel Papworth was involved in a series of in-depth face-to-face consultations with employers.
    Literacy Needs of Less Skilled Jobs
    Date: 1991
    Client: Department of Employment
    The Institute of Manpower Studies was commissioned to investigate the barriers to employment experienced by individuals with low levels of literacy and Rachel Papworth undertook a series of semi-structured employer consultations.
    Ethnic Monitoring
    Date: 1990
    Client: International Pharmaceuticals Manufacturer
    As part of an ongoing process of ethnic monitoring, undertaken by the Institute of Manpower Studies, Rachel Papworth produced the 1990 report, comparing the ethnic profile of the company's workforce to national benchmarks.
    Regional Variations in the Development & Delivery of Youth Training
    Date: 1990
    Client: Department of Employment
    Working for the Institute of Manpower Studies, Rachel Papworth analysed the data from a large scale quantitative survey of employers to identify regional variations in the development and delivery of the Government's Youth Training programme.

    Papworth Research & Consultancy Ltd :  92 Bonchurch Road, Brighton, East Sussex BN2 3PH  :  +44 (0) 1273 699993  :  enquiries@papworth.info
    Registered in England & Wales | Registration number: 07302269 | Registered office: Suite 1, Dubarry House, Hove Park Villas, Hove, East Sussex, BN3 6HP